Importance of electronic load to generator testing
Most generators are designed to provide an efficient power supply in emergency situations, such as when power companies lose power, and generators are a good choice for maintaining normal power supply to commercial facilities. If you have a working generator when the power goes out, you don't need to worry. But when the generator set breaks down, it can cause you a lot of inconvenience.
500kw load bank
The test of
electrical load on generator includes inspection and evaluation of generator set. It is necessary to ensure that all major components of the unit are operating under proper operating conditions. Currently, electronic load testing is performed manually, using specialized operating temperature and pressure level equipment. If the generator set needs to be run at more than 30% of rated power for an extended period of time, it must be regularly load tested.
The electrical load tests the generator to make sure it works when needed. The key to the test is to test the rated output of the generator during normal operation. This is especially important because during normal operation, many generators will not be operating at their rated capacity. This ensures that your generator can produce maximum horsepower while maintaining appropriate temperature and pressure levels, as well as operating efficiently for a sustained period of time.