Load bank delivery inspection and acceptance process

Delivery inspection of load bank
After the equipment is manufactured, It is necessary for Party B to carry out factory inspection according to the technical agreement confirmed by both parties. Party B can only deliver the goods after passing the factory inspection.
 


500kw load bank
 
Load delivery inspection content:
(1) Appearance inspection and line inspection
Check whether the appearance of the box body is intact, whether there is damage, whether clean and neat; Installation instruments, electrical components should be intact, installation position is correct, fixed firmly; All secondary circuit wiring is accurate, reliable connection, complete and clear marks.
(2) Insulation resistance test
Check the relative insulation resistance of main circuit.
(3) Power frequency withstand voltage test
(4) Control function check: check all control functions of load and confirm whether all functions are normal.
(5) Protection function check: Check whether the unit protection function meets the requirements.
Final acceptance of load
After party B's factory inspection, the equipment shall arrive at Party A's site for final acceptance. Final acceptance shall be carried out in accordance with the technical agreement confirmed by both parties.