UPS load bank - an essential test device for the power suppl
After installing the UPS, perform acceptance tests to check whether the UPS meets the design requirements and whether the power supply system can work safely and effectively. In this case,
ac load bank is used to test the PERFORMANCE of the UPS.
500kw load bank
UPS load test items are as follows:
1. Test the electrical quality parameters, display the UPS electrical quality parameters during the loading process, check whether the data is normal, accurate and in line with user requirements.
2. Load capacity: detect whether the UPS can reach the rated power and revise its nominal value to determine whether it can meet the actual power requirements.
3. Full load test to test the UPS operating status under full load and ensure the normal operation of the UPS in case of power failure.
4. You can specify the UPS to run with load for a long time at a certain power based on the actual load power.
5. Sudden addition and reduction test to simulate the real power consumption, and the UPS's bearing capacity and operating condition when the load is suddenly added.
6. Three-phase unbalanced load capacity, which simulates the real power consumption of UPS and the UPS regulation capacity when three-phase with unbalanced load.
7. UPS AC discharge, analog mains off is, the UPS uses battery discharge when the UPS working performance.
8. automatic stop protection function, beyond the UPS safety setting range, UPS can automatically stop protection.