Functions and applications of high voltage load in data cent
Key facilities in a data center are power distribution and air conditioning systems, and comprehensive testing is a load test of key facilities. However, IT equipment is gradually installed after the data center is delivered, that is, there is no high voltage load bank in the data center during construction acceptance, so many problems of critical facilities cannot be exposed. As a result, high voltage loads are created.
High voltage load bank is used to simulate the actual operation and heating of IT equipment to ensure the effective operation of various systems in the data center, such as power supply system (including UPS system), air conditioning system, lightning protection grounding system, and monitoring system. Problems can be found and solved in time through testing to prevent potential security risks.
high voltage load bank
The importance of high voltage load products:
High-voltage load bank verification test, as a comprehensive check and test before the commissioning of new data center, has been recognized and supported by more and more industry people. And in the new data center project as an indispensable key project link. The introduction of this link plays a very important role in project, operation, and data center life cycle management. It can eliminate hidden dangers in advance, establish operation and maintenance procedures, and carry out operation drills. It is also the final guarantee of the overall project delivery quality. At this stage, hidden dangers such as design, construction and equipment can be rectified at the lowest cost, so as to avoid systematic risks of the project.
Application areas:
Verify the cooling system, air flow environment, design specifications, and power system of the equipment room.